So far, in terms of the schedule, we are on track and actually a bit ahead of where we expected. Some unknown conditions which need to be addressed have been uncovered. This will mean more dollars are needed, and the Board of Directors will be considering a couple change orders at the Monday July 27th Meeting (7:30PM in the Mall Atrium under the Skylight). Fortunately these change orders should not interrupt progress.
Water Shutdown Schedule Updated July 24th
All shutdowns expected between 9am and 5pm. Please, do not flush your toilet or pour anything down the drain. It can cause damage below, interfere with the progress of the work, and delay the water being turned back on.
DATE KITCHENS BATHS OTHER
Mon. July 27th All 3rd to 29th Floors NEW: All 3rd to 29th Floors 2nd Floor Hallway Closed
– All Floors 3 to 55: All Floors 3 to 55:
– ’04, ’05, ’06, ’07, ‘08 GST ’06 Units
– ’09, ’10, ’11, and ’12 Units Both in ’11 Units
– NEW: ’04, ‘05
______________________________________________________________________
Tues. July 28th Floors 3 to 55: All Floors 3 to 55: 2nd Floor Hallway Closed.
– ’04, ’05, ’06, ’07, ‘08 GST ’06 Units
– ’09, ’10, ’11, and ’12 Units Both in ’11 Units
– NEW: ’09, ‘10
______________________________________________________________________
Wed. July 29th Floors 3 to 55: All Floors 3 to 55: Elevator 1 & 2 Access to
– ’01, ’02, ’03, ’14, and ‘15 GST ’01 Units 2nd Floor blocked.
– And ’04 Units
______________________________________________________________________
Thurs. July 30th All Floors 3 to 55: All Floors 3 to 55: Elevator 1 & 2 Access to
– ’01, ’02, ’03, ’14, and ‘15 GST ’01 Units 2nd Floor blocked.
– And ’04 Units
______________________________________________________________________
Friday July 24th No Shut Offs No Shut Offs None
______________________________________________________________________
Mon. Aug. 3rd All Floors 3 to 55: All Floors 3 to 55: Weight Room Closed.
– ’01, ’02, ’03, ’14, and ‘15 GST ’01 Units Locker Rooms may be
– And ’04 obstructed at times.
______________________________________________________________________
Tues. Aug. 4th All Floors 3 to 55: All Floors 3 to 55: Weight Room Closed.
– ’01, ’02, and ’03 Both ’01 Units Locker Rooms may be
– And ’02, ’04 Units obstructed at times.
______________________________________________________________________
Wed. Aug. 5th All Floors 3 to 55: All Floors 3 to 55: Weight Room Closed
– ’01, ’02, and ’03 Both ’01 Units Locker Rooms may be
– And ’02, ’04 Units obstructed at times.
______________________________________________________________________
Thurs. Aug. 6th All Floors 3 to 55: All Floors 3 to 55: Weight Room Closed
– ’02, and ’03 Both ’01 Units Locker Rooms may be
– ’02, ’03, ’04 and ‘15 Units obstructed at times.
THIS SCHEDULE IS SUBJECT TO CHANGE – we will do our best to spread word if that happens. While the water is off, PLEASE DO NOT FLUSH OR POUR ANYTHING DOWN DRAINS. This can cause damage below, delay the progress of the work, and delay the water coming back on. Also check www.ptcondo.com for updates.
LOBBY CEILING PROJECT AS OF JULY 22nd
Progress So Far And Water Shutdown Updates
Understandably, we had several visits and calls to the office Wednesday July 22nd. Scheduled water shut offs to tiers in the high rise (30th to 55th floors) did not occur. Fortunately, this was because work requiring the shut downs was completed, and the previously scheduled shutdowns were not necessary. In general, this is characteristic of the project so far…for the most part we are just a step ahead of schedule. Unfortunately, we realize when we put out notices and things change, it can cause some confusion, which we regret.
Going forward, this may occur from time to time. The nature and scope of the work being done and area being covered, makes it impossible to pinpoint 100% where precisely they will be working, how long it will take and whether extra time (or less) for shut offs may be needed. However, the contractor advised us if a scheduled shutdown does not occur by 10am or so, it may not be needed that day. If residents have questions about this at any time, do not hesitate to contact us.
Also, to make our schedule of shutdowns easier to read, we revised the format (based on an owner’s suggestion):
DATE & TIME KITCHENS BATHS OTHER
Wed. July 22nd All 3rd to 29th Floors All 3rd to 29th Floors 2nd Flr Locker Rooms
9am to 5pm
_________________________________________________________________
Thurs. July 23rd All Floors 3 to 55: All Floors 3 to 55: None
9am to 5pm ‘04, ’05, ’06, ’07, ’08, GST ’06 Units
– ’09, ’10, ’11, and ’12 Units Both in ’11 Units
_________________________________________________________________
Friday July 24th No Shut Offs No Shut Offs None
_________________________________________________________________
Mon. July 27th All Floors 3 to 55: All Floors 3 to 55: 2nd Flr Hallway Closed
9am to 5pm ‘04, ’05, ’06, ’07, ’08, GST ’06 Units
– ’09, ’10, ’11, and ’12 Units Both in ’11 Units
_________________________________________________________________
Tues. July 28th All Floors 3 to 55: All Floors 3 to 55: 2nd Flr Hallway Closed
9am to 5pm ‘04, ’05, ’06, ’07, ’08, GST ’06 Units
– ’09, ’10, ’11, and ’12 Units Both in ’11 Units
IMPORTANT NOTE: Sometimes the water will be on earlier than 5pm. However, complications can arise – and particularly if folks are flushing their toilets or water is otherwise coming down the drains, it can interrupt progress and delay the water coming back on by 5pm. So, please remember, if the water is off in a kitchen or bath, please do your best not to flush or use the drains for any reason.
Following Tuesday July 21st, water shutdowns will continue to other tiers. Once that has been mapped out by our staff and the contractors, we will issue you additional notices.
AC will be limited on Tuesday July 14th – Due to the water shut down, fresh water will not be available to the residential Cooling Tower, which will seriously limit the system’s ability to provide cooling. If the temperature does become uncomfortable in your unit, cooling will be available in the Mall. We will provide bottled water and extra seating if necessary for residents who would like to wait out the shutdown in the mall.
Drain lines are being worked on – Please Do Not Use Your Toilets – Anything that goes down the drains, could land on the workers, seriously interrupt the progress of their work, and damage property below. This goes for sinks, tubs and most importantly the toilets. We realize your toilet reservoir may have capacity for one or two flushes even after the water is shut off, but flushing would be hazardous for workers and property below. While you may want to store some water for drinking, please do not flush (or use any of the drains). Some folks have advised us they intend to store water for use if needed, which is fine – do not use the drains until the water is back on.
NOTE: The bathrooms in the mall will be operational and accessible during these outages!
Following shutdowns, water pressure issues are pretty likely in some units, particularly on hot water lines – Sediment may get flushed into faucet lines and clog aerators. Particularly those who run their water first when the system is charged back up. We will have a specialist in the building following Tuesday’s shutdown to handle calls, and after that by appointment. Please contact the office at 773-769-3250 if this happens (or the front desk after hours 773-769-3083).
Due to the importance of this announcement, all residents can also expect notices to be delivered to their door.
In order to accommodate plumbing repairs related to the ongoing lobby ceiling project, following is a list of upcoming water shutdowns expected:
Tuesday July 14th – 9am to 5pm – the ENTIRE building – all residential floors – all fixtures – all units, kitchens and bathrooms.
Wednesday July 15th – 9am to 5pm – all ’04 and ’05 unit kitchens – all ’06 unit kitchens and guest bathrooms – all ’07 unit kitchens – and all fixtures in the bathrooms and locker rooms on the 2nd Floor.
Thursday July 16th – 9am to 5pm – all ’06 unit guest and master bathrooms – all ’07 unit kitchens – and all ’05 unit bathrooms.
Friday July 17th – 9am to 5pm – all ’04 and ’05 unit kitchens – all ’06 unit guest bathrooms and kitchens – all ’07 unit kitchens – all ’08 and ’09 unit kitchens – and all fixtures in the bathrooms and locker rooms on the 2nd Floor.
Monday July 20th – 9am to 5pm – all ’06 unit guest and master bathrooms – all ’07 unit kitchens – all ’05 unit bathrooms – and all ’07 and ’08 unit bathrooms.
Tuesday July 21st – 9am to 5pm – all ’04 and ’05 unit kitchens – all ’05 unit bathrooms – all ’06 bathrooms and kitchens – all ’07 unit kitchens – and all fixtures in the bathrooms and locker rooms on the 2nd Floor.
There will be more to come as well – we expect daily shut offs in one form or another to continue for the next 3 weeks. So please, watch for notices and postings here and under your door.
ON DAYS WHEN YOUR BATHROOM IS SHUT DOWN, please do not flush the toilet. The drain line is being worked on, and there are workers below and property that could be damaged.
The workers will be cutting into the sewer lines, so particularly in the lobby we can expect some unpleasant odors.
Following shutdowns we expect some water pressure issues, particularly with hot water lines. There is sediment which could get flushed into faucet lines and clog aerators. Please contact the office at 773-769-3250 if this happens (or the front desk after hours 773-769-3083).
We regret any inconvenience this causes. Thank you in advance for your understanding and patience.