The last day for use will be Sunday September 15th
We realize the forecast is till calling for summer like temperatures around the period, however there are repairs we need to conduct before the team winterizes the pool for the season. Contractors are scheduled to repair a leak from the plumbing line which circulates water through the facility. This leak has resulted in problems below, including the bike room.
These repairs need to be completed in moderate weather. Because we are approaching dates where historically we’ve seen freezing temperatures, we are planning now.
After Sunday September 15th the pool will be drained and the line will be allowed to dry out. Tuesday September 17th at 8:30am, workers will begin cutting into the concrete to access the necessary line and plumbers will follow to begin the repair work. After the plumbers are done, the concrete and waterproof membrane will be repaired.
The Expected Work Schedule Is Tuesday September 17th Thru Monday September 23rd.
Work will be done between 8:30am-4pm
There will be noise from time to time, particularly in the mall area. This includes drilling and chiseling of the concrete and hammering.
We greatly appreciate everyone’s patience and understanding while this work is completed.